{"id":29,"date":"2014-11-20T14:10:02","date_gmt":"2014-11-20T14:10:02","guid":{"rendered":"http:\/\/www.szolnokiiparipark.hu\/en\/?page_id=29"},"modified":"2015-04-13T12:00:31","modified_gmt":"2015-04-13T12:00:31","slug":"news","status":"publish","type":"page","link":"https:\/\/www.szolnokiiparipark.hu\/en\/news\/","title":{"rendered":"News"},"content":{"rendered":"<div id=\"hir1\" style=\"display: none;\">   <!-- \u00d6sszecsuk\u00e1s eleje--> <\/p>\n<h2><a name=\"hir1\" id=\"hir1\"><\/a><\/h2>\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Jumpt to the top\"\/><\/a><\/div>\n<h2><strong><\/a>GIMA Szolnok Industrial Logistic Park applied for and won the title \u201cScientific and Technological Park\u201d from the Ministry of National Economy,   based on the developments of 2014. &#8220;<\/h2>\n<p> <\/strong><br \/>\nThe reason for awarding the title was constituted by, among others, the IT service centre applying the cutting-edge technology, where installed information technological devices provide the untroubled broadband data- and internet connection through the built-up fibre network besides the cloud-based server service for the enterprises, educational and other institutions.<br \/>\nThe modern structural, innovative engineering solutions of our buildings built for enterprises, the efficient black radiating devices representing the top technology in the world, the solar cells supplying the offices and social blocks with electricity provide low operating costs for the settlers.<br \/>\nIn addition to out investment of the electricity producing 630 KWp solar cell executed in the field of renewing energies in the park, the continuous innovation ensures further possibilities of technological investments and undisturbed operation of the infrastructure in the industrial park.<br \/>\nFor the development we are continuously cooperating in order to generate new joint projects with the regional, and other cooperating tertiary educational institutions, local municipalities, professional clusters open to other developments in the field of development of education, green building and waste management.<br \/>\nWe are continuously looking for inland and international possibilities of cooperation in the field of research, development, innovation. <\/p>\n<p>Further information is available in www.szolnokiiparipark.hu website and from laszlo.koos@t-email.hu address<\/p>\n<p>Szolnok, 19.03.2015<\/p>\n<p>L\u00e1szl\u00f3 Ko\u00f3s<br \/>\nManaging director<br \/>\nGIMA Szolnok Ipari Park Kft.<br \/>\n+36 30 9552858<\/p>\n<\/div>\n<p>   <!--- \u00d6sszecsuk\u00e1s v\u00e9ge--> <\/p>\n<div id=\"hir2\" style=\"display: none;\">   <!-- \u00d6sszecsuk\u00e1s eleje--> <\/p>\n<h2><a name=\"hir2\" id=\"hir2\"><\/a><\/h2>\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Jumpt to the top\"\/><\/a><\/div>\n<h2><strong><\/a>Project closing ceremony for the &#8220;Entrepreneur House Development Project of the GIMA Szolnok Industrial Park Ltd.&#8221;<\/h2>\n<p> <\/strong><\/p>\n<p><bPress release about the project closing ceremony of the \"GIMA Szolnok Industrial Park Infrastructure, IT Service Centre and Entrepreneur House\" project No. \u00c9AOP-1.1.1\/AB-11-2012-0024 of the Szolnok Industrial Part Ltd, and the Entrepreneur House Development Project No. \u00c9AOP-1.1.1\/A-13-2013-0005 of the Gima Szolnok Industrial Park Ltd.  \n\n\nThe implementation of the second project for facilitating deployment of industrial businesses of the GIMA Szolnok Industrial Logistics Park has been completed, as a result of which a new building with nearly 1700 m2 area was erected, and extended infrastructural developments were made in order to allow the moving in of many new companies, amounting to a total costs of 600 million HUF.<\/b><\/p>\n<p><a href=\"http:\/\/ipariparkblog.hu\/wp-content\/uploads\/2014\/09\/DSC4906.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-465\" src=\"http:\/\/ipariparkblog.hu\/wp-content\/uploads\/2014\/09\/DSC4906-300x199.jpg\" alt=\"_DSC4906\" width=\"300\" height=\"199\" \/><\/a><\/p>\n<p>The purpose of the GIMA Szolnok Industrial Park Ltd is the development and successful operation of the GIMA Szolnok Industrial Logistics Park. The justification for initiating the project came from the high demand for the premises and services of the industrial park, which could be converted into actual moving in of companies, if the area is successfully provided with  suitable infrastructure. The project included the erection of a IT Service Centre having an area of 668 m2, which accommodates server bank and data centre providing state of art cloud based services. The glass fibre based wide band internet and IP-telephone services are also handled through this centre, which are prerequisites for companies expected to move in the this part, such as a banking accounting centre, a R+D+I base, or a manufacturing base that can be reprogrammed even from abroad.<br \/>\nNaturally, the new services will also be available to the companies that have been present in the park, thus enhancing the information technology features of the park. An outstanding feature of the development is that the high amount of electricity required by the equipment operated in the park is partly provided by the solar panel based power plant with a capacity of 500 kwp deployed in the industrial part. Further companies are invited to move in the Entrepreneur House, which is a modern building with an area of 1000 m2, and it is provided with renewable energy source, and will allow the creation of new jobs for the region.<br \/>\nAbout 15 sites were prepared within the basic infrastructural development project for the companies that are planning to move in the park. The completed public utilities include gas supply network, drinking water supply network, sewerage, rainwater sewers, electrical network and telecommunication substructure and outdoor lighting networks, as well as the access road of the affected areas. Lamp fixtures with the modern Hungarian made LED light sources are also installed in the outdoor lighting networks for the purpose of testing and experimenting. The total cost of the project was close to net 600 million HUF, to which GIMA Ltd was awarded an EU grant of 299,865,000 HUF within the New Sz\u00e9chenyi Plan North-Plainland Operative Program.<\/p>\n<p>The third industrial deployment project of the GIMA Szolnok Industrial Logistics part has been completed, as a result of which new buildings were erected with a total area of 4600 m2 with a total value of 600 million HUF.<\/p>\n<p><a href=\"http:\/\/ipariparkblog.hu\/wp-content\/uploads\/2014\/09\/DSC4802.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-466\" src=\"http:\/\/ipariparkblog.hu\/wp-content\/uploads\/2014\/09\/DSC4802-300x199.jpg\" alt=\"_DSC4802\" width=\"300\" height=\"199\" \/><\/a><\/p>\n<p>The purpose of the GIMA Szolnok Industrial Park Ltd is the development and successful operation of the GIMA Szolnok industrial Logistics Park. The justification for initiating the project came from the high demand for the premises and services of the industrial park. The project included the construction of entrepreneur houses with areas of 2409 and 2166 m2, which are provided with state of art head building part and connected hall, which could be used even as manufacturing plants thanks to their size and arrangement, and which can accommodate the assets of at least 5 companies during the years after commissioning.<br \/>\nThe successful implementation of the project and the subsequent renting of facilities are assisted by the completed preparatory activities, as well as by the services included in the project and the activities promoting the investments. The plant halls are provided by the state of art and most efficient and energy saving K\u00fcbler black radiators and infra radiators using renewable energy. An electric generating unit is associated with each plant hall having a capacity of 50 kwp, which works with solar panels. The companies moving in the entrepreneur houses could create nearly 50 direct jobs for the region.<br \/>\nThe total budget of the project is nearly net 600 million HUF, to which GIMA Ltd was awarded an EU grant of 299,865,000 HUF within the New Sz\u00e9chenyi Plan North-Plainland Operative Program. From now on the GIMA Szolnok Industrial Park Ltd will be capable of offering beneficial flexible business instruments for the small and medium companies intending to move in for meeting the requirements for development of their premises in the Industrial Park located at the western side of Szolnok.<\/p>\n<p>We offer lots of opportunities ranging from construction site within the industrial park where public utilities are already installed, to the leased industrial plants in harmony with the requirements of the investors. Our company is ready to provide assistance to small and medium companies in their efforts to implement their investment projects including the designing, implementation and economic operation of the premises with the help of personnel, who have extensive experience in establishing premises. Regarding the size of the implemented investment project, it is one of the largest development within the industrial park. The program of the closing ceremony is available here.<br \/>\nFurther information may be obtained from:<\/p>\n<p>Ko\u00f3s L\u00e1szl\u00f3, media referee<br \/>\n<a href=\"http:\/\/www.szolnokiiparipark.hu\/en\">www.szolnokiiparipark.hu<\/a> <br \/>\nGIMA Szolnok Industrial Park Ltd.<\/p>\n<p>\nContact: (Tel:+36-30\/955-2858, email: <a href=\"mailto:laszlo.koos@t-email.hu\">laszlo.koos@t-email.hu<\/a>)<\/p>\n<\/div>\n<p>   <!--- \u00d6sszecsuk\u00e1s v\u00e9ge--> <\/p>\n<div id=\"hir3\" style=\"display: none;\">   <!--- \u00d6sszecsuk\u00e1s eleje--> <\/p>\n<h2><a name=\"hir3\" id=\"hir3\"><\/a><\/h2>\n<h2><strong><a name=\"hir2\"><\/a>Unentgeltliche Gesch\u00e4ftsportale der GIMA Szolnoki Ipari Park Kft.<\/strong><\/h2>\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Jumpt to the top\" \/><\/a><\/div>\n<p>  Im Einklang mit der Mission der GIMA Szolnoki Ipari Park Kft. wurde 2013 beschlossen, unentgeltliche Webportale zu sechs Themenbereichen in Form von Blogs einzurichten. Die Portale bezwecken die unentgeltliche Bereitstellung von f\u00fcr Unternehmen und Privatpersonen n\u00fctzlichen Informationen zum jeweiligen Themenbereich in Form von Fallstudien, Fachartikeln, Gesch\u00e4ftsangeboten und Ausschreibungsmonitoring. Auf den Seiten aktualisieren wir die von uns f\u00fcr hilfreich gehaltenen Informationen mit monatlicher Frequenz.<br \/>\nDie Portale sind hier zu erreichen:<\/p>\n<p><a href=\"http:\/\/blueeconomyblog.com\/\">Blue Economy Blog<\/a><br \/>\n<a href=\"http:\/\/greenenergy-blog.com\/\">Green Energy Blog<\/a><br \/>\n<a href=\"http:\/\/businessdevelopement-blog.com\/\">Business Development Blog<\/a><br \/>\n<a href=\"http:\/\/cloudserviceblog.com\/\">Cloud Service Blog<\/a><br \/>\n<a href=\"http:\/\/b2b-blog.hu\/en\">Business to Business Blog\/a><br \/>\n<a href=\"http:\/\/industrialparkhungaryblog.com\/\">IndustrialPark Hungary Blog<\/a>\n<\/div>\n<p>   <!--- \u00d6sszecsuk\u00e1s v\u00e9ge--> <\/p>\n<div id=\"hir4\" style=\"display: none;\">   <!--- \u00d6sszecsuk\u00e1s eleje--> <\/p>\n<h2><a name=\"hir4\" id=\"hir4\"><\/a><\/h2>\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Jumpt to the top\" \/><\/a><\/div>\n<h2>Areas presently offered for rent in the Entrepreneur House 2<\/h2>\n<p>More information:<br \/>\n    Gima Szolnok Ipari park Kft. (GIMA Szolnok, Industrial Park Ltd)<br \/>\n    Ko\u00f3s L\u00e1szl\u00f3<br \/>\n    Tel.: +36\/30\/955-2858<br \/>\n  e-mail: <a href=\"mailto:laszlo.koos@t-email.hu\">laszlo.koos@t-email.hu<\/a> <\/p>\n<p><a href=\"hir\/kiscsarnok_erekesitesi _FOLDSZINT.pdf\" target=\"_blank\"><br \/>\n  F\u00f6ldszinti csarnok r\u00e9sz &raquo;<\/a><br \/>\n    <a href=\"hir\/kiscsarnok_erekesitesi _EMELET.pdf\" target=\"_blank\">Emeleti<br \/>\n  irodar\u00e9szek &raquo;<\/a>\n  <\/p>\n<hr \/>\n<\/div>\n<p>   <!--- \u00d6sszecsuk\u00e1s v\u00e9ge--><\/p>\n<div id=\"hir5\" style=\"display: none;\">   <!--- \u00d6sszecsuk\u00e1s eleje--><br \/>\n  <a name=\"hir5\" id=\"hir5\"><\/a><\/p>\n<h2>Stage III of \u201eA GIMA Szolnok Industrial Park Ltd Entrepreneur House Development Project\u201d \u00c9AOP1.1.1\/A-132013-0005<\/h2>\n<p><o:p><\/o:p><\/span><\/b><\/h2>\n<p class=\"MsoNormal\">Project description:<br \/>Two entrepreneur houses will be constructed within the project, including the associated public utilities. The buildings of Entrepreneur House 4 and Entrepreneur House 5 will be available for the producing and service provider companies that are expected to move in. <span style=\"mso-spacerun:yes\">&nbsp;<\/span><o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">Floor areas:<br \/>Planned Entrepreneur House 4:<span style=\"mso-tab-count:1\"><\/span>2.408,92 m2<br \/>Planned Entrepreneur House 5.:<span style=\"mso-tab-count:1\"><\/span>2.166,6 m2<o:p><\/o:p><\/p>\n<p class=\"MsoNormal\">A hall part with a headroom of 6 m will be established within the planned buildings, and two social and office blocks  will be established at two levels. Black-white locker rooms separately for men and women will be established at the ground floor for blue collar workers, while offices will be constructed at the first floor with separate sanitary unit for the office staff. <\/p>\n<p>The hall part will be established with two compartments, between which a sliding door will be installed to allow passage within the building. Sectionalized gates will be used for each unit to allow access, and canopies will be erected over the entrances. The buildings will be constructed with traditional building structures, and will include state of art mechanical and electrical building services, lightning protection, noise and vibration control features. The heated and thermally insulated building structures of the building comply with the  relevant provisions of 7\/2006 TNM and meet the requirements for energy management. <o:p><\/o:p><\/p>\n<p class=\"MsoNormal\"><o:p>&nbsp;<\/o:p>The definite objective of the Gima Szolnok Industrial Park Ltd is to establish conditions for producing the service provider companies in the Entrepreneur Houses, for the purpose of which the company also performs activities to encourage investment.<o:p><\/o:p><\/p>\n<p class=\"MsoNormal\"><o:p>&nbsp;<\/o:p>The development serves the objectives of the companies already settled, as well as the companies yet to move in. The benefit for the companies to move in is the possibility of renting premises with reasonable conditions, while the existing companies could establish contact with the new ones. The larger number of companies settled in the park will provide indirect benefits also (increased turnout, additional services, more public utilities, etc.)  <o:p><\/o:p><\/p>\n<p class=\"MsoNormal\"><o:p>&nbsp;<\/o:p>A We offer places within the Entrepreneur Houses for 5 companies, which have a useful base area of 4575.52 m2. The creation of 46 jobs is expected by these settling companies.  <o:p><\/o:p><\/p>\n<p class=\"MsoNormal\"><b><span style=\"font-size:9.5pt;font-family:&quot;Verdana&quot;,&quot;sans-serif&quot;\"Signing the Support Contract<br \/>Stage III of \u201eA GIMA Szolnok Industrial Park Ltd Entrepreneur House Development Project\u201d \u00c9AOP1.1.1\/A-132013-0005<o:p><\/o:p><\/span><\/b><\/p>\n<p class=\"auto-style1\"><o:p><img loading=\"lazy\" decoding=\"async\" height=\"274\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/Koos2_szerk.jpg\" width=\"206\"><\/o:p><\/p>\n<p class=\"MsoNormal\">The GIMA Szolnok Industrial Park Ltd received support again for its project &#8220;GIMA Szolnok Industrial Park Ltd Entrepreneur House Development Project\u201d No. \u00c9AOP1.1.1\/A-132013-0005. The support contract was signed on 8 August 2013 in Debrecen at the headquarters of \u00c9ARF\u00dc. According to the Support Contract, the total costs of the development is 599,775,000 HUF, from which 50 % is to be paid from own resources, while the other 50 %, i.e. 299,887,500 HUF, is regarded as a grant with no obligation to pay back.  <o:p><\/o:p><\/p>\n<p class=\"auto-style1\">\n<o:p><\/o:p><\/p>\n<p><\/p>\n<hr \/>\n<\/div>\n<p>   <!--- \u00d6sszecsuk\u00e1s v\u00e9ge-->  <\/p>\n<div id=\"hir27\" style=\"display: none;\">   <!--- \u00d6sszecsuk\u00e1s eleje-->  <\/p>\n<h2><a name=\"hir27\" id=\"hir27\"><\/a><\/h2>\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Jumpt to the top\" \/><\/a><\/div>\n<h2>Stage II of &#8220;GIMA Szolnok Industrial Park Infrastructure, IT Service Centre and Entrepreneur House&#8221; project No. \u00c9AOP-1.1.1\/AB-11-2012-0024<br \/><\/h2>\n<p>We submitted yet another application under the title &#8220;GIMA Szolnok Industrial Park Ltd Infrastructure, IT Service Centre and Entrepreneur House Project&#8221;, as a result of which additional development will be implemented. <\/p>\n<p>Objective of the project:<\/p>\n<p>The entire investment project will be implemented within the area of the Industrial Park, not as a brown field development. The two essential elements of the investment project are the construction of building and the development of the basic infrastructure.Yet another stretch of road will be constructed as part of the development of basic infrastructures, and the plots next to the road will be provided with public utilities. The public utilities to be established include the lighting of the road, construction of gas network, construction of drinking water network, sewerage, electrical network and the telecommunication network.  <\/p>\n<p>The useful base area of the Entrepreneur House is 1048.06 m2, which could provide area for one or more companies according to the plan of the investor. The hall parts can be divided according to the needs along the lines of the lattices (main girders) using metal framework and plasterboard lining established up to the ceiling. In the office-social block the companies could use common sanitary blocks separately for men and women, while offices and conference rooms are available for them at the first floor.<br \/>\nThe Tenant plans to start special data park information technology services (server hosting, storage place, virtual server renting) in the IT Service Centre, which has a useful area of 668.64 m2. The strategic plan of the GIMA Szolnok Industrial Logistics Park for 2015 includes the invitation of a company that could provide wideband modern internet services in the IT Service Centre.\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/palyazati_fejlesztesek.jpg\" alt=\"\" width=\"297\" height=\"172\" align=\"right\" \/><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/Atnezeti_terkep.pdf\" target=\"_blank\">Tervezett<br \/>\nfelt\u00e1r\u00f3 \u00fat \u00e1tn\u00e9zeti rajza &raquo;<\/a><br \/>\n  <a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/Vallakozoi_h1(A3).pdf\" target=\"_blank\">V\u00e1llalkoz\u00f3 H\u00e1z 3<br \/>\nhelysz\u00ednrajza &raquo;<\/a><br \/>\n  <a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/IT_h2(A3).pdf\" target=\"_blank\">IT Szolg\u00e1ltat\u00f3h\u00e1z helysz\u00ednrajza &raquo;<\/a>\n<\/p>\n<div style=\"clear:both\"><\/div>\n<p>IT Service Center visualization:<\/p>\n<table width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"10\">\n<tr>\n<td width=\"50%\" align=\"center\"><a href=\"hir\/megvalosult2_5.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_5k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<td align=\"center\"><a href=\"hir\/megvalosult2_4.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_4k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td align=\"center\"><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_3.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_3k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<td align=\"center\"><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_1.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_1k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td align=\"center\"><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_2.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_2k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<td align=\"center\">&nbsp;<\/td>\n<\/tr>\n<\/table>\n<p>Entrepreneur houses 3 visualization:<\/p>\n<table width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"10\">\n<tr>\n<td width=\"50%\" align=\"center\"><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_6.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_6k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<td align=\"center\"><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_7.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_7k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<\/tr>\n<tr>\n<td align=\"center\"><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_8.jpg\" rel=\"lightbox[megvalosult2]\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/megvalosult2_8k.jpg\" alt=\"\" border=\"0\" \/><\/a><\/td>\n<td align=\"center\">&nbsp;<\/td>\n<\/tr>\n<\/table>\n<p>&nbsp; <\/p>\n<hr \/>\n<\/div>\n<p>   <!--- \u00d6sszecsuk\u00e1s v\u00e9ge-->  <\/p>\n<div id=\"hir6\" style=\"display: none;\">   <!--- \u00d6sszecsuk\u00e1s eleje-->  <\/p>\n<h2><a name=\"hir6\" id=\"hir6\"><\/a><\/h2>\n<ul>\n<li><a href=\"javascript:ReverseDisplay('hir26')\">Stage II of &#8220;GIMA Szolnok Industrial Park Infrastructure, IT Service Centre and Entrepreneur House&#8221; project No. \u00c9AOP-1.1.1\/AB-11-2012-0024<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir7')\">Stage I of the &#8220;Gima Szolnok Industrial Logistics Park Infrastructure, Entrepreneur House development project&#8221; No. \u00c9AOP-1.1.1\/A-2.K\u00d6R-2008-0004<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir26')\">The technical implementation of the application on the subject of \u201cDevelopment of a Competitive Business Environment\u201d within the framework of the \u201cEconomy Development Operative Program\u201d in the GIMA Szolnok Industrial Park. <\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir8')\">The green policy of Gima Szolnok Industrial Park Ltd has been determined<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir9')\">The Mission of Gima Szolnok Industrial Park Ltd has been determined<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir10')\">Gima Szolnok Industrial Logistics Park Infrastructure,Entrepreneur  House development project<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir11')\">Farmexpo at Gima Szolnok Industrial Park<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir12')\">Agricultural exhibition and fair at Gima Szolnok Indutrial Park<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir13')\">Inportant development in Gima Szolnok Industrial Logistics Park<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir14')\">An investment of HUF 650 million from September 2009<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir15')\">A suitable and turn-key site for enterprises<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir16')\">Szolnok Economy Days<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir17')\">15. Internatonal industrial fair and market<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir18')\">Industrial park widens out<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir19')\">Agreement on installation of energy-saving lighting systems<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir20')\">An agreement has been concluded between the College of Szolnok and Gima Szolnok Ipari Park Kft.<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir21')\">Organisation of industrial park services has began<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir22')\">Preliminary terrain correction industrial development area has began<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir23')\">Clean-up on the development area of Gima Szolnok Industrial Logistics Park<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir24')\">We have obtained the title &quot;Industrial Park&quot; of the state<\/a><\/li>\n<li><a href=\"javascript:ReverseDisplay('hir25')\">Park of complexe opportunities<\/a><\/li>\n<\/ul>\n<div id=\"hir7\" style=\"display:none;\">\n<h2>Stage I of the &#8220;Gima Szolnok Industrial Logistics Park Infrastructure, Entrepreneur House development project&#8221; No. \u00c9AOP-1.1.1\/A-2.K\u00d6R-2008-0004<\/h2>\n<p>The Gima Szolnok Industrial Park Ltd submitted an application and was awarded a support in 2008 for its project entitled &#8220;Gima Szolnok Industrial Logistics Park Infrastructure, Entrepreneur House development project&#8221;. The planned project was implemented within the premises of the Gima Szolnok Industrial Park Ltd. The net value of the project is 648.807.622 HUF, and was implemented with the support from the EU, using the associated financing by the European Regional Development Fund, thus the support by the EU amounts to 50 % of the total value.<br \/>\nA road, together with all kinds of public utilities, was constructed in the first stage of the investment project as the extension of the \u00dajsz\u00e1szi road between the Nagys\u00e1ndor J\u00f3zsef road and the Budapest-Szolnok railway line. This stretch of road also serves as an access road to the development area of the industrial park having an area of 40 ha. As a result of the completed works, public utilities were established for an area having a size of 10 ha, which is categorized as state owned &#8220;Industrial Park&#8221;. Two entrepreneur houses were constructed in the second stage of the investment project, which offer modern premises and business environment for Hungarian small and medium companies, which would allow their successful operation. Production and storage area are available in suitable sizes and quality, which have a low operating cost, and sanitary and office blocks with modern infrastructure are available for helping the work of the companies. Within a separate premises occupying an area of 5500 m2, one of the two entrepreneur house has a useful area of  1334 m2, while the other has an area of 507 m2. It is expected that fifteen new jobs will be created by the investment project through the basic and associated services at the companies moving in, and the project will ensure regular work for local companies and entrepreneurs.\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/palyazati_fejlesztesek.jpg\" alt=\"\" width=\"297\" height=\"172\" align=\"right\" \/><br \/>\nSzolnok, 2012.10.08.<br \/>\n  &nbsp;<br \/>\n  <br \/>\n  Gima Szolnok Ipari park Kft. (Gima Szolnok Industrial Park Ltd)<br \/>\n  Ko\u00f3s L\u00e1szl\u00f3<br \/>\n  Tel.: +36\/30\/955-2858<br \/>\ne-mail: <a href=\"mailto:laszlo.koos@t-email.hu\">laszlo.koos@t-email.hu<\/a><\/p>\n<\/div>\n<div id=\"hir8\" style=\"display:none;\">\n<h2><strong><a name=\"hir26\"><\/a>The green policy of Gima Szolnok Industrial Park Ltd has been determined<\/strong><\/h2>\n<p>AThe mission of the GIMA Szolnok Industrial Park Ltd includes the creation of state of art business environment according to the latest technologies. The quality and the environmental awareness are determining values within the green policy of our company. The full documentation about the green policy of the GIMA Szolnok Industrial Park Ltd can be downloaded from HERE.\n<\/p><\/div>\n<div id=\"hir9\" style=\"display:none;\">\n<h2><strong><a name=\"hir9\"><\/a>The mission  of Gima Szolnok Industrial Park Ltd has been determined<\/strong><\/h2>\n<p>\nFar exceeding conventional development objectives, our company is also committed to sustainable development providing considerable social benefits. The mission of GIMA includes the following:<\/p>\n<ul>\n<\/li>\n<p>The mission of the Szolnok Ipari Park Kft. is the establishment of an up-to-date and highly developed business environment providing competitive, operational and economic benefits for companies settled or to be settled in the Industrial Park and utilizing its services.<\/li>\n<\/li>\n<p>Fulfilling an integrator function to serve development needs based on a wide network of professional relationships and several decades of professional knowledge of our experts.<\/li>\n<\/li>\n<p>Undertaking social responsibility by popularizing and employing green and renewable energy generation and energy storage technologies.<\/li>\n<\/li>\n<p>Facilitation of employing efficient technologies with minimal carbon emission levels (blue economy).<\/li>\n<\/li>\n<p>Establishment of a Technology Park and and Green Industrial Park, a research and development centre besides the Industrial Park.<\/li>\n<\/ul>\n<\/div>\n<div id=\"hir10\" style=\"display:none;\">\n<h2>The Gima Szolnok Industrial Logistics Park Infrastructure, Entrepreneur House development project<\/h2>\n<p>The customers and the visitors of our web page are informed by the Gima Szolnok Industrial Park Ltd, that the infrastructural stage has been completed within our development project entitled &#8220;GIMA Szolnok Industrial Park Infrastructure, IT Service Centre and Entrepreneur House&#8221; No. \u00c9AOP-1.1.1\/A-2.k\u00f6r-2008-0004 granted to our company. People travelling in the industrial part aligned along the  in the \u00dajsz\u00e1szi and Nagys\u00e1ndor J\u00f3zsef street are satisfied with the quality of the new road stretch completed as a result of the development, and many motorists chose it as an alternative route when communing to work<\/p>\n<table width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tr>\n<td colspan=\"2\">\n<div align=\"center\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/banner.gif\" alt=\"\" width=\"203\" height=\"60\" \/><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"50%\" align=\"center\" valign=\"top\">\n<p><strong>Before:<\/strong><\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/szolnok110310_007.jpg\" width=\"280\" height=\"210\" \/><\/strong><\/p>\n<\/td>\n<td width=\"50%\" align=\"center\" valign=\"top\">\n<p><strong>After:<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/kozmu_epites_007.jpg\" width=\"280\" height=\"210\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/kozmu_epites_042.jpg\" width=\"280\" height=\"210\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/kozmu_epites_044.jpg\" width=\"280\" height=\"210\" \/><\/p>\n<\/td>\n<\/tr>\n<\/table>\n<p>&nbsp;<\/p>\n<p>The establishment of the modern infrastructure is not the concluding state of the development. Our company construct two entrepreneur houses in the near future, which will be ready for the companies for moving in by May 2011 according to our plan<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir11\" style=\"display:none;\">\n<h2>Farmexpo at Gima Szolnok Industrial Park\/h2><\/p>\n<p><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/farmerexpo.pdf\" target=\"_blank\">View PDF<\/a><\/p>\n<\/div>\n<div id=\"hir12\" style=\"display:none;\">\n<h2>Agricultural exhibition and fair at Gima Szolnok Indutrial Park<\/h2>\n<p><a href=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/agrarkialltias.pdf\" target=\"_blank\">View PDF<\/a><\/p>\n<\/div>\n<p><!------------------><\/p>\n<div id=\"hir13\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Inportant development in Gima Szolnok Industrial Logistics Park<\/h2>\n<p>After long negotiations installation of a manufactory introducing a state of the art technology has come near to us in the Gima Szolnok Industrial Logistics Park, at the development area under construction at \u00dajsz\u00e1szi \u00fat.<br \/>\nThe planned greenfield investment intends to establish a modern led manufactory. As a result of the investment more than 100 working place will be founded and a very new production technology can be introduced which may have a more important impact on the development of the park and of the industry of Szolnok as the present investment. Products produced by the factory can materially promote the changing of the obsolete and wasteful lighting units with new, energy-saving lighting units of the domestic lighting industry, which is the interest of the national economy by today&#8217;s energy prices.<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir14\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>An investment of HUF 650 million from September 2009<\/h2>\n<p>In the Gima Szolnok Industrial Logistics Park the Gima Szolnok Ipari Park Kft. starts an investment with the subvention of the EU, as a result whereof an improved site of 10 ha will be available to settling enterprises. Furthermore, two halls will be built for two settling enterprises. Planned end of the investment is 2010.<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir15\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>A suitable and turn-key site for enterprises<\/h2>\n<p>Gima Szolnok Ipari Park Kft. offers suitable and turn-key sites (plots, halls) to enterprises in the frame of a flexible financial construction, at a short date. Our offer addresses first of all small and middle-sized undertakings who want to have a modern site and who appreciate exapnsive outsorcing services helping their operation, and in case of availment thereof they are able to reach dinamic development by increasing effectiveness and utilizing competitive advantage. Gima Szolnok Industrial Logistics Park disposes of the title &quot;industry park&quot; of the state, settling enterprises  can use the advantages of this title noth in tenders and in services. A further advantage is cooperation with other settled companies and utilizing of sinergies.<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir16\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Szolnok Economy Days<\/h2>\n<p>Gima Szolnok Ipari Park Kft. participates on Szolnok Economy Days on the 10th-11th of September 2009, which will be organized in the Aba-Nov\u00e1k Culture Centre. The company offers his new plots in the industrial park and turn-key<br \/>\n    halls to the undertaking sector to a discount price, under advantageous financial constructions, during the fair.<\/p>\n<p align=\"center\" style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/szolnoki_gazd_napok.jpg\" alt=\"ki\u00e1ll\u00edt\u00e1s\" width=\"374\" height=\"500\" \/><\/p>\n<p><a href=\"hir\/Szolnoki_Gazdasagi_Napok.pdf\" target=\"_blank\">Download informative material (Pdf format)<\/a><\/p>\n<hr \/>\n<\/div>\n<div id=\"hir17\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>15. Internatonal industrial fair and market<\/h2>\n<p>Gima Szolnok Industrial Logistics Park, under cooperation with &quot;Magyar Ter\u00fcletfejleszt\u00e9s \u00e9s Vagyonkezel\u00e9si T\u00e1rsas\u00e1g&quot; (Hungarian Area Development and Assets Management Company) participates on the 15th International industrual<br \/>\n    fair and market between 27-30 of May 2008. Besides foreign investors we intend show settling opportunities in the industrial park and advantages thereof to interested hungarian micro, small and middle-sized undertakings. On behalf<br \/>\n    of MTVT, Anik\u00f3 Andriska chief secretary disclosed that experiences of former years show there is an emerging inquiry on the part of hungarian undertakings  after sites in the industrial park assuring modern operational conditions.<br \/>\n    The attractiveness is increased by the decision, if an undertaking decides to settle in the industrial park, it may receive many facilities by exploitation of tender opportunities. In case of \u00c9szak-Alf\u00f6ld region 50% non refundable<br \/>\nsubsidy may be received for machines and technologies. Gima Szolnok Industrial Park Kft. helps with offering special financial constructions for undertaking planning to settle to obtain an own site. L\u00e1szl\u00f3 Ko\u00f3s managing director has<br \/>\ndisclosed that collaterally with the fair there are negotiations in progress about simultaneous realization of undertaking&#8217;s house in the industrial park<br \/>\n  where companies from Szolnok and from the surroundings design to settle.<\/p>\n<p align=\"center\" style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/cikk10-1.jpg\" alt=\"Az ipar napjai\" width=\"120\" height=\"116\" \/><\/p>\n<p align=\"center\" style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/cikk10-2.jpg\" width=\"560\" height=\"622\" alt=\"\" \/><\/p>\n<p>Szolnok, the 27th of May 2008<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir18\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Industrial park widens out<\/h2>\n<p>As a result of construction workson the 25th of April 2008 the operational area of Gima Szolnok Industrial Logistics Park widens out, because G\u00e1bor G\u00e9rnyi appointed head of department signed our demand on widening the industrial park.<br \/>\n  The operational area of the industrial park has widen thereby to 868.611 m2. We are proud of this development because many have understood that the opportunity of the future is teamwork and therefore they have joined our integration. At<br \/>\n  the moment 46 companies from 5 countries employ 1626 workers inside the park. The value of investments exceed USD 89 million. Main settled sectors are following:<\/p>\n<ul>\n<li> vehicle manufacturing and repair<\/li>\n<li>constructional engineering, tool engineering,<br \/>\n    plating<\/li>\n<li> chemical industry, pharmaceutical industry<\/li>\n<li> timber industry<\/li>\n<li> waste recovery<\/li>\n<li> distribution<\/li>\n<li> wholesale<\/li>\n<\/ul>\n<p>Szolnok, 30th of April 2008<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir19\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Agreement on installation of energy-saving lighting systems<\/h2>\n<p>On the 15th of April 2008 Gima Szolnok Ipari Park Kft. has agreed with ITL Energy Kft. on the propagation of energy-saving lighting systems to interested undertakings. Substance of the agreement is to present the intelligent energy-saving<br \/>\nlighting systems developed by the Italian Beghelly company to interested parties. If they need the system, an offer will be made for installation after consultation and factual measurement. The essential thing is that the investment shall not<br \/>\nbe paid right away, it shall be paid even from energy savings during 7 years. According to experiences, besides advantages of the modern system the former energy will be 10% lower than before, instalments included. In case of agreement<br \/>\nthe industrial park contributes to realization and assures continuous maintenanceof installed systems. Those who are interested shall contact Gergely Csonka<br \/>\nor L\u00e1szl\u00f3 Ko\u00f3s in the industrial park.<\/p>\n<p> Szolnok, 20th of April 2008<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir20\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>An agreement has been concluded between the College of Szolnok and Gima Szolnok Ipari Park Kft. <\/h2>\n<p>P\u00e9ter Sz\u00e9kely, Dr the rector of the College of Szolnok and L\u00e1szl\u00f3 Ko\u00f3s managing director of Gima Szolnok Ipari Park Kft. have signed an agreement on cooperation,in the frames whereof the College cooperates in the service, educational, tendering and R+D activities within the frame of Gima Szolnok Industrial Park Kft. By undersigning the agreement parties stated that the agreement assures only an opportunity to the parties but they need hard and persistent work to fulfil the opportunities outlined in the agreement with really serious content. In the first step the services of the College is intended to approximated to interested undertakings settled in the industrial park. Furthermore, they want to provide advisory, tendering and accounting services. Gima Szolnok Ipari Park Kft. wishes to help the students of the College to obtain professional practice and to choose subject for reserch thesis by involving undertakings in the program settled in the industrial park. Both parties have disclosed their confidence to realize a common project serving basicly new directional economical reasons,<br \/>\nbut this shall be handeled as confidential until termination of negotiations.<\/p>\n<p>Szolnok, 16th of March 2008<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir21\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Organisation of industrial park services has began<\/h2>\n<p>Bearing the title &quot;Industrial Park&quot; of the state lays a charge on its holder the Gima Szolnok Ipari Park Kft. One o the purposes of the industrial park is to create an advantageous economical environment to settled undertakings.<br \/>\n  One of its elements is organisation of such service systems which facilitate operation for undertakings and insures costs efficiency by outcourcing out-of-profile activities. On behalf of management of the industrial park we purposed to establish<br \/>\n  an integrated service system, in conformity with needs of the companies during implementation. We purposed as first starting security services, furthermore, based thereon the cleaning and gardening services. We believe that after consultations<br \/>\n  with company managers we will able to reach a cost efficient solution in above themes and in other requirements as well. Increase of future competitiveness requires teamwork of the companies in order to reduce costs. The industrial<br \/>\n  park wishes to contribute in this organizational work and to achieve common conceptions.<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir22\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Preliminary terrain correction industrial development area has began<\/h2>\n<p>Preliminary terrain correction works required to investments on development area of the industrial park ahs began on the 10th of May 2007. In the frame thereof the aggradation of the area with inert rubble on relevant sites to 86 m baltic level has began. Container station and required infrastructure has been established in order to receive aggradation materials and to organise works. During the works, in connection with equal opportunity program also workers with disabilities has been employed by Gima Szolnok Ipari Park Kft.<\/p>\n<table width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"3\">\n<tr>\n<td>\n<div align=\"center\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/070515-1.jpg\" alt=\"\" \/><\/div>\n<\/td>\n<\/tr>\n<\/table>\n<p align=\"center\">&nbsp;<\/p>\n<p>Szolnok, the 15th of May 2007<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir23\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>Clean-up on the development area of Gima Szolnok Industrial Logistics Park<\/h2>\n<p>In cooperation with the municipality of Szolnok city the Gima Szolnok Ipari Park Kft. has performed a clean-up in Szolnok, along \u00dajsz\u00e1szi \u00fat. The clean-up had to be performed because of rubbish placed illegally along the road. Works<br \/>\n  took more than one week and more than thousand m3 of rubbish had to be removed. Long after, as result of the cleaning at last normal conditions has been established  along the road. We thank to participants for their work and the promoters Ferenc<br \/>\nSzalay major and S\u00e1ndorn\u00e9 Bagdi deputy.<\/p>\n<table width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"3\">\n<tr>\n<td>\n<div align=\"center\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/070510-1.jpg\" width=\"250\" height=\"187\" alt=\"\" \/><\/div>\n<\/td>\n<td>\n<div align=\"center\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/070510-2.jpg\" width=\"250\" height=\"187\" alt=\"\" \/><\/div>\n<\/td>\n<\/tr>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Szolnok, the 10th of May 2007<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir24\" style=\"display:none;\">\n<div style=\"float: right\"><a href=\"#top\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/felnyil.gif\" border=\"0\" alt=\"\" title=\"Ugr\u00e1s az oldal tetej\u00e9re\" \/><\/a><\/div>\n<h2>We have obtained the title &quot;Industrial Park&quot; of the state<\/h2>\n<p>In her letter dated 2nd of April 2007 Ildik\u00f3 Cserveny\u00e1k, Dr. the competent  head of department of Ministry of Industry has notified Gima Szolnok Ipari Park Kft. that his application for bearing the title &quot;Industrial Park&quot; of the state was successful. After three years of organisational work our activity in the industrial park has come to an important milestone. By holding the title, the way is now free for other organizational works. Companies who joined the<br \/>\nindustrial park may have effective advantages by this title, because such undertakings receive additional points by tenders. (copy of the notification letter attached)<\/p>\n<p align=\"center\"><strong><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/ipari_park_cim.gif\" alt=\"Ipari Park c\u00edm\" width=\"550\" height=\"907\" \/><\/strong><\/p>\n<p>Szolnok, the 5th of April 2007<\/p>\n<hr \/>\n<\/div>\n<div id=\"hir25\" style=\"display:none;\">\n<h2><strong>Park of complexe opportunities<\/strong><\/h2>\n<div style=\"float: right;\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/cikk11.jpg\" alt=\"Ko\u00f3s L\u00e1szl\u00f3\" hspace=\"5\" vspace=\"5\" \/><\/div>\n<p>A new settling wave can be expected in the Gima Szolnok Industry Park where 32 companies have already been settled. Though there is an area with silimar function on the southern part of the city the opportunities have not been exploited<br \/>\nyet. Many people have great expectations concerning the 40 ha which is ths so-called development area of the Szolnok Ipari Park Kft. One of these people is L\u00e1szl\u00f3 Ko\u00f3s, managing director of GIMA who counts on good traffic and geographical<br \/>\nsituation. It is a fact, that the triangular area between Nagys\u00e1ndor J\u00f3zsef utca and \u00dajsz\u00e1szi \u00fat has many facilities. The old road Nr. 4 is close, andthe join of M4 and M8 highways under construction will be 4 km far from this<br \/>\npark of 100 ha. You can reach the motorway M3 direction Graz, R\u00e1baf\u00fczes, Veszpr\u00e9m, Duna\u00fajv\u00e1ros, Kecskem\u00e9t and Eger on motorway. Ferihegy airport which is situated 75 km far from here can be reached in 50 minutes, and two other airports are<br \/>\neven closer. One of these is suitable for starting and landing of smaller airplanes and the larger military airport with concreted flight-strip operating day and night is also suitable for larger machines upon former notification. The area<br \/>\ndisposes all of the facilities which make Szolnok to one of the logistic sub-centres of Hungary. One of the largest railway junction can be fouund in the city. Most of the goods going to Ukraine and Russia will be taken over here and passenger<br \/>\nand freight trains in direction Balkan and Eastern Europe start also from here.Further advantage is Tisza which is a third category riverway. The issue of the Main can be reached along the Danube and the Main, and in southern direction<br \/>\nthe Black Sea can be reached as well.<\/p>\n<p>Besides logistic points of view own opportunities of the industrial park are also important. The managing director emphasizes that undertakings are received not even with fully improved sites. It is natural that water, gas, electricity<br \/>\nand canal are already available or will be available by settlement owing to continuous development, but also infrastructural network and optical wires are laid down. The Kft. offers its services on market prices (banking, postal servcices, event organisation, interpreting) which are generally used by the<br \/>\npartners.<\/p>\n<div style=\"float: left;\"><img decoding=\"async\" src=\"http:\/\/www.szolnokiiparipark.hu\/wp-content\/themes\/twentythirteen\/img\/szolnok\/cikk12.jpg\" alt=\"ipari park\" hspace=\"5\" vspace=\"5\" \/><\/div>\n<p>Owing to its approved local partners, the GIMA Szolnoki Ipari Park Kft. renders help to setting companies even by planing and implementing, and if required also by operation. Besides the management is also working on acquisition of resources required to investments. They try to use the opportunity that industrial park developments in this area may receive the largest subventions under the seven  domestic regions within \u00c9szak-Alf\u00f6ldi Operative Program.<\/p>\n<p>Alltogether 39 regular, square sites of half and one hectare can be formed. This means at farthest so many companies can settle here, but sites can be merged, therefore final number can be even smaller. In the sight of L\u00e1szl\u00f3 Ko\u00f3s 1400 workers are already working on the area which can have a brilliant future. Opportunities are good because logistic facilities are excellent and newcomers can have highly qualified employees locally. Furthermore, workers can participate on useful trainings and retrainings concerning market activity. According to his estimations a yearly turnower of HUF 10 billion can be reached by undertakings in the industrial park. Different companies can be found here: representatives of timber industry, tool engineering, paper converting, commercial, glue manufacturer and car distributor industry and non-ferrous metal exploiter and air condigion service can be also found here. Under well-known companies can be found J\u00e1szkun Vol\u00e1n and B\u00e9res Pharamaceutical Enterprise. The managing director emphasizes that protection of the environment is realised not even by changing the uncultivated wooded area by a replacement wood, but also in every other aspects. Settled companies purpose building-up a closed technology<br \/>\nsystem for utilization of rubbish issued between incoming of raw material and outgoing of end-product.<\/p>\n<\/div>\n<div id=\"hir26\" style=\"display:none;\">\n<p><strong>The technical implementation of the application on the subject of \u201cDevelopment of a Competitive Business Environment\u201d within the framework of the \u201cEconomy <img loading=\"lazy\" decoding=\"async\" class=\" size-medium wp-image-543 alignright\" style=\"margin-right: 20px;\" src=\"http:\/\/ipariparkblog.hu\/wp-content\/uploads\/2014\/08\/gop-300x207.png\" alt=\"gop\" width=\"300\" height=\"207\" \/>Development Operative Program\u201d in the GIMA Szolnok Industrial Park. <\/strong><\/p>\n<p><strong>The competitiveness provided by the modern and developed business environment ensures operating and economic advantages for the enterprises wanting to settle in the Industrial Park later and those currently working in the park. An integrated part of the basic infrastructure provided by the park is the information technological background. This information communication potential is of prominent importance in order to ensure competitiveness, therefore GIMA Szolnok Ipari Park Kft. deals with it as a prominent target field, and as possible, it brings these modern information communication technologies within accessible closeness \u2013 through partnerships \u2013 for its partners, companies working in the industrial park.\u00a0 <\/strong><\/p>\n<p>Therefore the development aims worded in the GOP-2013-3.3.2 application on the subject of \u201cDevelopment of a Competitive Business Environment\u201d entering the implementation phase are integrally adapted to the objectives of the previously implemented \u201cInfrastructure, IT Service House and Entrepreneurs\u2019 House Development Projects\u201d.<\/p>\n<p>The aim of the Industrial Park is to provide wideband internet service operating with the most up-to-date technology for the companies wanting to settle within the framework of the project. A part of the development implemented in the project is expansion of the information communication basic infrastructure covering several areas \u2013 wideband internet service -, as well as the existing service portfolios. The transmission technical system to be procured is adjusted to the special expectations arising from the nature of the development. The optic network to be built up, (installation of IP telephone), the licences related to the development (storage, recording of digital contents, application of virtualisation technologies, WEB technologies), the rights to use resources, as well as the migration tasks, the WEB-based integration of the system all serve the provision of the competitive business environment for both the market partners and those wanting to settle.<\/p>\n<p>The development to be implemented consists of the following main parts:<\/p>\n<ul>\n<li>procurement of devices for the wideband optic network, obtaining licences, utilization of services, as well as marketing activities connecting to release in the market.<\/li>\n<\/ul>\n<p>The scheduled implementation period of the project is from 02.01.2014 to 31.12.2015.<\/p>\n<p>The total budget of the project is nearly 500 million HUF, to which GIMA Szolnok Ipari Park Kft. contributes with HUF 243,190,570, the European Union within the framework of the Economy Development Operative Program with HUF 206,711,984, and the Hungarian State from the budget with a subsidy of HUF 36,478,586.<\/p>\n<p>More detailed information on the project can be found in the <a href=\"www.szolnokiiparipark.hu\"><span style=\"text-decoration: underline;\">www.szolnokiiparipark.hu<\/span><\/a> website.<\/p>\n<p>More information related to the technical implementation of the project can be asked for through the following availability:<\/p>\n<p>L\u00e1szl\u00f3 Ko\u00f3s<\/p>\n<p>e-mail: laszlo.koos@t-email.hu<\/p>\n<p>Contact: Mobile: 06 30\/955-2858<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>GIMA Szolnok Industrial Logistic Park applied for and won the title \u201cScientific and Technological Park\u201d from the Ministry of National Economy, based on the developments of 2014. &#8220; The reason for awarding the title was constituted by, among others, the IT service centre applying the cutting-edge technology, where installed information technological devices provide the untroubled [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"hirek_en.php","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-29","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/pages\/29","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/comments?post=29"}],"version-history":[{"count":43,"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/pages\/29\/revisions"}],"predecessor-version":[{"id":365,"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/pages\/29\/revisions\/365"}],"wp:attachment":[{"href":"https:\/\/www.szolnokiiparipark.hu\/en\/wp-json\/wp\/v2\/media?parent=29"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}